Building Perspectives
Images are virtual and may not perfectly represent reality.
Images are virtual and may not perfectly represent reality.
Building Floor-Plans
Underground
Ground Floor
First Floor
Second Floor
Mezzanine
Completion of the construction work: SUMMER 2026
Architectonic Design: A43 (www.a43.pt)​
Construction: Fielnorte (www.fielnorte.pt)​​​
​
Construction Supervision: JAC Engenharia (www.jacengenharia.com)
The project is made up of two buildings, the building to the north called Azuaga 68 and the building to the south called Ernesto 65, with construction works starting in July 2024.
​
​The Azuaga 68 building is made up of 10 units, 4 T0, 4 T1 and 2 T2.
​The building will be built with a medium to high-end standard finishing.
The apartments will have: kitchen with Margrés ceramic flooring or similar, bench top in Silestone compact quartz, living rooms and bedrooms with oak flooring and walls covered in painted plasterboard; bathroom covered with Margrés ceramics or similar. The sanitary appliances will all be a high-end model.
All apartments will be delivered with all appliances, Siemens, and Midea air conditioning. Heat pump water heating system. Energy certification will be level A.
​​Both buildings have an elevator and the access ramp to the garage will be via Rua Ernesto Silva.
​
You can download the finishing table here.